Kathmandu, June 14
The vehicular movement which was earlier disrupted on the Narayanghat-Mugling road has
resumed two-way. A huge landslide had disrupted traffic since last midnight.
The District Police Office, Chitwan, has stated that two-way traffic has resumed since this
morning.
Similarly, after four days’ efforts, the Aanbukhaireni section of the Prithvi Highway has been operative two-way. Two-way traffic has resumed along the way since Monday evening.
The road was damaged near the powerhouse at Aanbukhaireni-4. Earlier, a section of the road had caved in.